Skip to content
NewDatafor 10.02 is out: subscriptions and metric alerts, in Slack and Teams
Datafor

Visualization / Charts

Ring progress

Show one measure's progress toward a target as a ring; target measure or fixed target, ring settings, labels and conditional colors.

Show one measure’s progress toward a target as a ring. Use it for a completion or achievement question with a meaningful denominator. Use Gauge when readers also need a scale with tick values.

Set actual and target

  1. Add Components → Charts → Cards & KPI → Ring progress (a new ring is 260 × 240 px, one ring and a name line) and choose an Analysis model in Data.
  2. Put the actual amount in Progress measure and the target in Target measure.
  3. If you use a fixed target instead of a target measure, enter it in Style → Plot area → Target value.
  4. Set Filters so actual and target cover the same period and population.

For example, 75 completed items against a target of 100 represents 75% achievement. A decimal rate of 0.75 must be compared with a target of 1, not 100. Avoid a zero target: a meaningful progress percentage needs a valid denominator.

The automatic title names only the Progress measure, not the target.

Ring progress in Preview: Net Sales for 2025 at 86.94% of a fixed Target value of 3,500,000, with the name line under the percentage

Make the meaning visible

Option (Style) Effect Default
Plot area → Diameter Size of the ring, 10–100%. 95%
Plot area → Ring thickness Thickness of the ring, 1–30%. 10%
Plot area → Inner padding Inner padding of the ring, as a percentage of the ring width (−50 to 100%). 0%
Plot area → Corner radius Rounded ends of the progress ring. Off
Plot area → Ring background Color of the unfinished part of the ring. #E0E0E0
Plot area → Target value Fixed target, used when no Target measure is bound. Empty
Plot area → Progress direction Clockwise or Counterclockwise. Clockwise
Data colors → Conditional color Ring color by condition; see below.
Data labels → Label contents Hidden, Value or Percentage in the center. Percentage
Data labels → Percentage precision Decimals of the percentage. 2
Data labels → Show name, Name, Name font A name line under the value. If Name is empty, the Progress measure’s name is shown. Show name on for new rings; off in reports from earlier versions
Data labels → Sub-label, Sub-label font Adds the Progress measure and/or the Target measure value, so readers can see the amounts behind the percentage. None

Use a concise name such as Order completion. The ring has no Show Tooltip switch.

Conditional color opens a dialog where you choose the Configuration type, Value or Percentage, and add ranges with a Start value, an End value (blank means −∞ or +∞) and a Color. A percentage condition and a value condition are different: check the selected type and test the boundary values. Use conditional colors only when the thresholds have a clear meaning.

Above target, empty values and clicks

Above 100% the ring is simply full, so it cannot show how far a result exceeds the target. Read the numeric label, and show the amounts with Sub-label when that matters.

If the percentage is unexpected, check units, zero or missing targets and whether the target measure repeats at a finer grain.

When the actual value is empty, the ring shows the empty-data message instead of 0.00%, also with a fixed target. Style → Empty data only changes the text; see Empty data and error messages.

Clicking the ring does not filter, drill or highlight anything, but a script under Actions → Events → Plot area click runs.

Opening reports made before 10.00
  • Ring background is now applied. Earlier versions drew the unfinished part in the palette’s second color (often red), so such rings look different.
  • A ring without an actual value shows the empty-data message instead of 0.00%.
  • The automatic title no longer includes the target measure.